Da Nang, located in Central Vietnam, is a city with a dynamic economy spanning various fields, including manufacturing, tourism, and information technology. This vibrant environment has attracted numerous domestic and international investors. Known for its stunning natural beauty, talented workforce, advanced infrastructure, and tranquil living environment, Da Nang offers immense potential for investment. The proactive efforts of the local government to improve the investment climate position the city for significant future growth.
Moreover, Da Nang is emerging as a leader in industrialization, modernization, and global integration. The city has consistently ranked high in the Provincial Competitiveness Index (PCI) due to its transparency and business-friendly environment since 2007. This has also encouraged world-class professional service providers like KPMG to expand their client network here.
No. |
Project name |
Location |
Objective, scale, and related parameters of the project |
Divergence |
Land status |
Legal basis for project formulation |
I. EDUCATION AND TRAINING FIELD: 04 PROJECTS |
||||||
|
Kindergarten, primary school, secondary school |
A1-3 Land Lot, Truong Quoc Dung - Phan Huy Thuc - Khuc Thua Du streets, Nai Hien Dong ward, Son Tra district |
- Area: 14.607m2 |
2023 - 2024 |
The land has been cleared and is used as a city area for gathering debris, lowering prices, storing temporary construction materials |
Notification No. 24/TB-UBND dated April 13, 2022, of he City People's Committee on the conclusions of Vice Chairman of the City People's Committee Le Quang Nam at the meeting to review reports on certainarchitectural and planning projects in the city. - Decision No. 2451/QD-UBND dated November 7, 2023 of the City People's Committee on the approval of the Han Riverfront and Eastern Bank zoning plan, scale 1/2000 |
|
The college trains highly skilled workers according to internationaland regional standards |
Eastern area of the Centralized IT Zone/Da Nang Hi-Tech Park. |
- Minimum land area: 40.000m2. - Training scale: 2,000 students per year at college and intermediate levels, meeting international and regional standards in priority development fields such as automation, high-tech agriculture, precision mechanics, and logistics industries including transportation, warehousing, port services, aviation, and multimodal transportation services. - Design standards: In accordance with the regulations of the Ministry of Construction. |
2022 - 2025 |
|
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 2971/QD-UBND dated July 8, 2019, by the Da Nang City People's Committee issuing the "Vocational Education Development Plan for Da Nang City until 2025, with orientation toward 2030." |
|
Living skills experience area for students |
Hoa Vang district |
- Area: 46 ha, in the Western Ecological subdivision. - Objective: To invest in the construction and operation of an extracurricular education and life skills center combined with ecotourism. |
2022 – 2025 |
|
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. |
|
University urban area |
Hoa Quy ward, Ngũ Hành Sơn district |
- Area: 20 ha, part of the Innovation Zone. - Objective: To construct and operate a university urban area that includes an Education and Training Zone, a Practice Hotel, an Eco-villa Area, and other auxiliary facilities to meet the practical and living needs of students, experts, and other users. |
2023 - 2025 |
Currently in the process of land clearance. |
- Decision No. 986/QD-TTg dated July 9, 2020 by the Prime Minister approving the 1:2000 subdivision plan for the construction of Da Nang University, including the project “Development of Technical Infrastructure and Essential Facilities for Da Nang University in Hoa Quy – Dien Ngoc.” - Decision No. 3472/QD-UBND dated September 18, 2020 by the People's Committee of Da Nang City approving the addition of land use plans for 2020 for Ngu Hanh Son District People's Committee. |
II. HEALTHCARE FIELD: 1 PROJECT |
||||||
|
Nursing home |
Land plot designated as A2.8, located at the intersection of three main streets: Tran Nam Trung, Tran Quoc Thao, and Liem Lac 5, Hoa Xuân ward, Cam Le district. |
Land for construction of social service facilities. - Area: 10,964 m² - Functional zones includes care areas and nursing areas. - Planning indicators: + Construction density: ≤ 39.23%; + Building height: 3-5 floors; + Land use coefficient: ≤ 2.0. - Project components: Administrative and service zone (1,742 m²); Resort and accommodation zone (2,550 m²); Landscape green area (3,630 m²); Parking area (1,383 m²); Transportation area (1,650 m²). |
2022 - 2025 |
Land has been cleared |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 207/QD-UBND dated January 20, 2022 of the City People's Committee approving the List of land funds for auction of land use rights, phase 1, 2022. - Decision No. 3905/QD-UBND dated December 6, 2021 approving the adjustment of the detailed plan scale 1/500. - Decision No. 849/QD-UBND dated March 30, 2022 of the City People's Committee on approving the plan to auction land use rights for the land to build a Nursing Home at Land Lot A2-8 in the expanded Area E2 (phase 1), Hoa Xuan Ward, Cam Le District, Da Nang City. |
REAL ESTATE FIELD - TOURISM, SERVICES, TRADE: 06 PROJECTS |
||||||
|
Smart urban complex – Tax-free zone (Hill Slope subdivision) |
Located along both sides of Hoang Van Thai extended road in the communes of Hoa Nhon, Hoa Ninh, and Hoa Phu, Hoa Vang District. |
Estimated area: 850 ha (part of the Hill Slope subdivision). |
2022 – 2025 |
Land not yet cleared |
Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. |
|
Linked housing service area; Software park no. 2 |
Thuan Phuoc ward, Hai Chau district |
Area: 24,252 m² |
2022 – 2025 |
Land has been cleared |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 207/QD-UBND dated January 20, 2022 of the City People's Committee approving the List of land funds for auction of land use rights, phase 1, 2022. |
|
Bach Dang - Nguyen Van Troi Bridge - Tran Hung Dao Pedestrian Street |
Along Bach Dang Street, Parks at Both Ends of Nguyen Van Troi Bridge, and Nguyen Van Troi Bridge |
Total area: 197,017 m², including areas planned for investment through socialization with a total area of 2,263 m², consisting of: - Sculpture park in front of Han Market: 17 m² - Café, bar, yacht area: 1,283 m² - Dragon Eye viewpoint area (end of Binh Minh 9 street): 451 m² - Dragon Egg – Nighttime illuminated dome: 512 m² |
2022 - 2025 |
The design study area will only renovate the landscape on the sidewalks of the existing roads without any ground leveling. |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 3763/QD-UBND dated October 8, 2020, by the Da Nang People's Committee approving the adjusted detailed planning at a 1/500 scale for the Bach Dang - Nguyen Van Troi - Tran Hung Dao pedestrian street. |
|
International Standard Shopping Center |
Land Plot A1-2-1 within CTCC A1 Zone of the 200m road project connecting Han River bridge to the sea, An Hai Bac ward, Son Tra district. |
Construction of a shopping center. - Area: 9,754 m² - Planning indicators: + Purpose of use: Commercial and service land; + Construction density: ≤ 60%; + Land use coefficient: ≤ 13.0; + Building height: ≤ 30 floors & 2 basements; + Building height Limit: ≤ 104m; + Construction boundary: Minimum 6.0m from the red line of An Don 2 street, Ly Thanh Tong street, Pham Van Dong street, Hoang Duc Luong street, Ngo Quyen street, and the pedestrian path between the two land lots. |
2022 – 2025 |
The land has been cleared for development. |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 3379/QĐ-UBND dated October 25, 2021 by the City People's Committee approving the detailed 1:500 planning. - Decision No. 207/QĐ-UBND dated January 20, 2022 by the City People's Committee approving the list of land plots for auction of land use rights (First Auction in 2022). - Decision No. 1939/QĐ-UBND dated September 7, 2023 by the City People's Committee approving the auction plan for land use rights for land plot A1-2-1 within the road corridor from Han River Bridge to the sea on Pham Van Dong Street, An Hai Bac Ward, Son Tra District, Da Nang City. - Decision No. 1940/QĐ-UBND dated September 7, 2023 by the City People's Committee on the auction of land use rights for land plot A1-2-1 within the road corridor from Han River Bridge to the sea on Pham Van Dong Street, An Hai Bac Ward, Son Tra District, Da Nang City. - Decision No. 2621/QĐ-UBND dated November 30, 2023 by the City People's Committee approving the starting land price for auction of land use rights for land plot A1-2-1 within the road corridor from Han River Bridge to the sea on Pham Van Dong Street, An Hai Bac Ward, Son Tra District, Da Nang City. |
|
Botanical park |
Hoa Phu commune, Hoa Vang district |
- Area: 1,975,687 m² - Construction density: ≤ 5% - The scale includes items and utilities such as: Botanic center (91,965 m²); Evolution garden (206,152 m²); National orchid garden (212,538 m²); Children's garden (180,885 m²); Tropical forest (225,035 m²); World tree conservation forest (358,459 m²); Nursery (45,286 m²); Exhibition garden (29,109 m²); Camping area (166,773 m²); Lake and square (228,244 m²) |
2022–2025 |
Forest and water surface area |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 1745/QD-UBND dated March 29, 2016 of the City People's Committee on approving the detailed master plan at a scale of 1/500 of the Botanical Garden |
|
Hoa Phuoc wholesale market |
Hoa Phuoc commune, Hoa Vang district |
- Objective: Investment and operation of a wholesale market for livestock, poultry, and agricultural products. - Area: 309,229 m², including: + Business area: 76,072 m² + Warehouses, logistics services, regional product display and promotion: 12,336 m² + Market management office: 2,448 m² + Wastewater treatment station: 2,448 m² + Green spaces, drainage ditches, concrete yards, container parking, vehicle parking, and traffic infrastructure: 215,861 m². |
2022 - 2025 |
Includes rice cultivation land (27 ha), perennial crop land, residential land, and garden land.
The People's Committee of the city is responsible for land clearance and ground leveling. |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 7732/QD-UBND dated November 8, 2016 of the City People's Committee on approving the detailed planning of the 1/500 scale Wholesale Market for livestock, poultry and agricultural products. |
CULTURE AND SPORTS FIELD: 02 PROJECTS |
||||||
|
Ngu Hanh Son Cultural and Historical Park |
Hoa Hai ward, Ngu Hanh Son district |
- Area: 92.46 ha - Preparing the planning for the historical relic of the scenic area |
2022 - 2025 |
- Land use status: Residential land and agricultural land. - Land clearance is underway. |
- Decision No. 519/QĐ-TTg dated April 16, 2020, by the Prime Minister approving the planning tasks for conservation and restoration of the special national scenic site Ngu Hanh Son. - Decision No. 7904/QĐ-UBND dated October 1, 2004, by the City People's Committee approving the detailed 1:500 construction plan for the Ngu Hanh Son cultural and historical park in Hoa Hai ward, Ngu Hanh Son district. |
|
Sports, entertainment, and commercial complex |
Hoa Xuan ward, Cam Le district |
- Area: 23.15 ha - Includes a recreational sports track, commercial services, and shopping areas… |
2022 - 2025 |
Land has been cleared |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 179/QD-UBND dated February 2, 2023 of Cam Le District People's Committee on approving the detailed planning project at a scale of 1/500 Planning project: Hoa Xuan sports, entertainment and commercial complex, Hoa Xuan ward - Location: Hoa Xuan ward, Cam Le district, Da Nang city. |
INDUSTRIAL INFRASTRUCTURE AND INFORMATION TECHNOLOGY FIELD: 6 PROJECTS |
||||||
|
Construction and business operations of Hoa Cam industrial zone infrastructure phase 2 |
Hoa Tho Tay ward, Cam Le district, and Hoa Nhon commune, Hoa Vang district |
- Area: 120.19 ha. - Project Scale: + Industrial factory construction area: 657,895 m² (54.82% of the total area). + Administrative and service area: 13,936 m² (1.16% of the total area). + Construction area of technical infrastructure projects: 13,575 m² (1.13% of the total area). + Green space: 184,194 m² (15.34% of the total area). + Traffic area: 220,441 m² (18.37% of the total area). - Industries Attracting Investment: Focus on industries with low hazard levels (Level IV, Level V) and the clean industry orientation, including: Mechanical assembly, component manufacturing, electronics, and electrical products; Consumer goods and household appliance production; Agricultural, forestry, and aquatic product processing; Other industrial services. |
2022 - 2025 |
- Current Land Use Status: Vacant land 52%; Existing industrial land 6%; Hill and mountain land 25%; Residential land 6%; Rice paddy land 3%; Annual crop land 5%; Cemetery land 2%; Traffic land 1%. - Technical infrastructure investment cost: 1,161 billion VND; - Compensation and site clearance costs: 1,074 billion VND.
|
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 4100/QĐ-UBND dated September 16, 2019, by the Chairman of Da Nang City People's Committee, approving the 1/500 detailed planning for Hoa Cam industrial zone phase 2. - Decision No. 363/QĐ-TTg dated March 18, 2022, by the Prime Minister, approving the investment policy for the construction and business of infrastructure in Hoa Cam industrial zone phase 2. |
|
Construction and business of Hoa Ninh industrial park infrastructure |
Hoa Ninh commune, Hoa Vang district |
- Area: 400.02 ha - Project Scale: + Industrial factory construction area: 221.22 ha (55.3% of the total area). + Administrative and service area: 5.94 ha (1.48% of the total area). + Construction area of technical infrastructure projects: 5.02 ha (1.25% of the total area). + Green spaces and water surfaces: 124.94 ha (15.34% of the total area). + Traffic land: 220,441 m² (31.23% of the total area). - Industries attracting investment: Meeting the requirements of low toxicity level (Level IV, Level V) belonging to the main clean industry orientation group including: Electronics, mechanical engineering, consumer goods manufacturing, garment, pharmaceutical, animal feed, high-end construction materials manufacturing... production activities with advanced technology, suitable for the potential and strengths of Da Nang |
2022 – 2025 |
- Current Land Use Status: Agricultural land 17.96%; Forestry land 29.5%; Vacant land: 45.31%; Other land (public facilities, religious sites, farms, cemeteries, water surfaces, existing residential areas, traffic land) 7.23% - Technical infrastructure investment cost: 3,519 billion VND - Compensation and site clearance cost (including resettlement): 3,280 billion VND |
- National List of Foreign Investment Projects 2021-2025, issued under Decision No. 1831/QĐ-TTg dated November 1, 2021, by the Prime Minister. - Decision No. 5383/QD-UBND dated November 25, 2019 of the Chairman of Da Nang City People's Committee on approving the 1/2000 scale planning of Hoa Ninh industrial park. - Report No. 50/TTr-UBND dated April 27, 2021 of the City People's Committee sent to the Ministry of Planning and Investment on approving the investment policy of the Project on investment in construction and business of infrastructure of Hoa Ninh industrial park. |
|
Creative Space |
Hoa Xuan ward, Cam Le district |
- Total area for planning adjustment research: 172,980m2 including Software Park area of about 99,236m2 and Service Area associated with housing of about 73,744m2. - Floating connection: Organize a pedestrian bridge above with a unique architectural form, connecting the base blocks of independent buildings into a unified whole. The pedestrian bridge is connected at the 3rd floor of the project, with 2 floors, the lower floor is for rain and sun protection. The upper floor is like an elevated park, a green space, for rest and relaxation in the environment. |
2022 – 2025 |
Land has been cleared. |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 4936/QD-UBND dated December 16, 2020 of the City People's Committee approving the detailed planning adjustment project at a scale of 1/500 of the Creative Space Project in Hoa Xuan ward. - Decision No. 207/QD-UBND dated January 20, 2022 of the City People's Committee approving the List of land funds for auction of land use rights in the first phase of 2022. |
|
Data center and office complex, exhibition and display area for information technology (IT) |
Da Nang concentrated IT zone |
- Objective: Building an office complex; Data Center; IT exhibition and fair area...; Service area to support the IT zone. - Scale: area of 8.7 ha including 4 office complex buildings combined with 26-storey Data center, exhibition area, fair area... - Estimated investment: 10-15 million USD/ha. |
2022 – 2025 |
- Land has been cleared. - Electricity: 110/22kV substation, capacity of 40MVA. - Water: Hoa Trung Lake Water Plant: 20,000m³. - Wastewater/waste treatment system: Total capacity: 18,000m³/day & night. - Current capacity: 4,500m³/day & night. - Transportation: 33m and 40m roads connected in a grid pattern, directly linking to Nguyen Tat Thanh extended road and the La Son – Tuy Loan expressway. |
National list of projects calling for foreign investment in the 2021-2025 period issued in Decision No. 1831/QD-TTg dated November 1, 2021 of the Prime Minister |
|
Specialized factory area, ICT support, Da Nang concentrated IT zone |
Da Nang concentrated IT zone |
- Objective: Develop an R&D zone for researching hardware, software, digital content, and IT service products,… - Area: 57.7 ha, factory scale 02-06 floors - Construction density 40%. - Estimated investment: 10-15 million USD/ha. |
2022 – 2025 |
||
|
R&D Zone, Da Nang concentrated IT zone |
Da Nang concentrated IT zone |
- Objective: Establish an R&D zone for research on hardware, software, digital content, and IT-related products and services; develop a training center, innovation labs, and startup hubs. - Area: 12 ha, scale 06-10 floors - Construction density 40% - Estimated investment: 08-10 million USD/ha. |
2022 – 2025 |
||
HIGH-TECH INDUSTRY FIELD: 03 PROJECTS |
||||||
|
Project in the aerospace technology field |
High-tech zone |
Encouraged to achieve a minimum of 15 million USD/ha |
2022 – 2025 |
Clean land with completed technical infrastructure |
- Decision No. 38/2020/QD-TTg dated December 30, 2020 of the Prime Minister promulgating the List of high technologies prioritized for investment and development and the List of high-tech products encouraged for development. - Decision No. 5468/QD-UBND dated November 30, 2019 of the City People's Committee approving the adjustment of the 1/500 Detailed Planning of Da Nang High-Tech Park. |
|
The project is in the field of technology design and robot manufacturing. |
High-tech zone |
Encouraged to achieve a minimum of 15 million USD/ha |
2021 – 2025 |
Clean land with completed technical infrastructure |
- National list of projects calling for foreign investment in the period 2021-2025 issued in Decision No. 1831/QD-TTg dated November 1, 2021 of the Prime Minister. - Decision No. 38/2020/QD-TTg dated December 30, 2020 of the Prime Minister promulgating the List of high technologies prioritized for investment and development and the List of high-tech products encouraged for development. |
|
Biological sensor and chip manufacturing project |
High-tech zone |
Encouraged to achieve a minimum of 15 million USD/ha |
2021 – 2025 |
Clean land with completed technical infrastructure |
- National list of projects calling for foreign investment in the period 2021-2025 issued in Decision No. 1831/QD-TTg dated November 1, 2021 of the Prime Minister. - Decision No. 38/2020/QD-TTg dated December 30, 2020 of the Prime Minister promulgating the List of high technologies prioritized for investment and development and the List of high-tech products encouraged for development. |
HIGH-TECH AGRICULTURE FIELD: 04 PROJECTS |
||||||
|
Project on production of organic and ecological agricultural products, applying high technology to serve tourism |
Hoa Khuong – Hoa Phong high-tech agriculture zone, Hoa Khuong and Hoa Phong communes, Hoa Vang district |
- Focus on producing safe, organic agricultural products using high technology, integrated with a sightseeing and rest area to serve eco-tourism. - Total area: 16.2 ha, of which Agricultural production land: 5.5 ha (34%); Clean vegetable cultivation land: 3.7 ha (23%); Green space and water surface: 3 ha (13.5%); Transportation land: 2 ha (12.7%). - Investors will develop the project according to designated production zones. |
2022 – 2025 |
- Agricultural, forestry, and perennial crop land: 129,620 m² - Vacant land: 30,183 m² - Traffic land, ditches: 2,334m2 |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 25/QD-UBND dated January 25, 2019 of the Chairman of the City People's Committee on approving the adjustment of the detailed plan at a scale of 1/500 of the High-tech Agricultural Zone of Hoa Khuong - Hoa Phong commune. |
|
High-tech and organic agricultural production project (vegetables, flowers, medicinal plants) |
Hoa Phu High-tech agricultural zone, Hoa Phu commune, Hoa Vang district |
- Attracting investment in vegetable, flower, and medicinal plant cultivation. - Total area: 20.9 ha, divided into 10 production lots ranging from 1 ha to 1.8 ha; green space: 4.5 ha (21.6%); transportation land: 2 ha (10%). - Investors will develop the project according to designated production zones. |
2022 – 2025 |
- Agricultural land: 180,075 m² - Water surface area: 311 m² - Forestry land: 23,959 m² - Cemetery land: 77 m² - Transportation land: 2,601 m² |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 787/QD-UBND dated March 7, 2020 of the Chairman of the City People's Committee on approving the adjustment of the detailed planning at a scale of 1/500 of the High-tech Agricultural zone of Hoa Phu commune. |
|
High-Tech and Organic Vegetable Production Project |
Hoa Khoung high-tech agricultural zone, Hoa Khuong commune, Hoa Vang district |
- Attracting investment in safe vegetable cultivation and high-tech agriculture. The total area covers 28.8 hectares, divided into 11 production plots ranging from 1 to 3 hectares each; green space occupies 6.4 hectares (22.3%); transportation land covers 2.6 hectares (9%). - Investors will develop the project according to designated production zones. |
2022 – 2025 |
- Agricultural land: 239,488 m² - Water surface area: 8,119 m² - Vacant land: 36,839 m² - Transportation land: 3,949 m² |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 786/QD-UBND dated March 7, 2020 of the Chairman of the City People's Committee on approving the adjustment of the detailed planning at a scale of 1/500 of the High-tech Agricultural Zone of Hoa Khuong commune. |
|
Aquaculture and Exploitation Combined with Ecotourism |
Truong Dinh hamlet, Hoa Lien commune, Hoa Vang district |
- Area: 50 ha. - Attracting investment in high-tech brackish water aquaculture (shrimp, crab) combined with eco-tourism. |
2022 – 2025 |
Existing aquaculture land with local farmers engaged in aquaculture activities. |
- Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. - Decision No. 1936/QD-UBND dated April 13, 2017 of the People's Committee of Da Nang City on approving the planning location of the High-Tech agricultural production area in Da Nang City. - Plan No. 7513/KH-UBND dated November 16, 2021 of the People's Committee of Da Nang City on Tourism Development in Da Nang City for the period 2021-2025. |
TRANSPORTATION, INFRASTRUCTURE, AND LOGISTICS FIELD: 09 PROJECTS |
||||||
|
Parking Lots |
Parking lots in the city center and tourism development areas |
Investment in parking lots across the city to meet parking demands in the city center and coastal areas. |
2022 – 2025 |
Land has been cleared. |
- Official dispatch No. 2317/UBND-SGTVT dated April 20, 2021 of the City People's Committee, in which the Department of Natural Resources and Environment and the Land Fund Development Center are assigned to develop a land auction plan for the purpose of investing in public parking lots. - Decision No. 2864/QD-UBND dated December 25, 2023 on the auction of land use rights for the Land Lot at 51A Ly Tu Trong, Thach Thang Ward, Hai Chau District, Da Nang City. - Decision No. 2675/QD-UBND dated December 6, 2023 on the auction of land use rights for the Land Lot at 383 Cach Mang Thang Tam Street, Hoa Tho Dong Ward, Cam Le District, Da Nang City |
|
Lien Chieu port |
Lien Chieu district |
Construction of port berths and port infrastructure |
2022 – 2025 |
Water surface |
- Decision No. 435/QD-TTg dated March 25, 2021 of the Prime Minister approving the project investment policy. - The Management Board of Priority Infrastructure Investment Projects is the investor and project operator (according to Official Dispatch No. 3593/UBND-DTDT dated June 14, 2021 of the City People's Committee). - Decision No. 1059/QD-UBND dated April 18, 2022 of the City People's Committee approving the project to adjust the detailed planning of Lien Chieu Seaport and the coastal road connecting Lien Chieu Port, scale 1/500. |
|
High-tech park logistics center |
High-tech park |
The Logistics Center supports the Air and Rail Logistics Hub, with a planned scale of 3 hectares by 2030. |
2025 - 2030 |
Land has been cleared. |
Decision No. 5778/QD-UBND dated December 3, 2018 approving the Planning for Logistics Infrastructure Development of Da Nang City to 2030, with a vision to 2045. |
|
Lien Chieu port logistics center |
Lien Chieu port, Lien Chieu district |
Regional seaport logistics center, grade I, scale by 2030 is 35 ha. Investors are proposed based on each development phase. |
2025 - 2030 |
Land has not yet been cleared |
- Decision No. 5778/QD-UBND dated December 3, 2018 approving the Planning for the development of logistics infrastructure in Da Nang city to 2030, with a vision to 2045. - Decision No. 359/QD-TTg dated March 15, 2021, by the Prime Minister approving the Adjustment of the Master Plan for Da Nang City until 2030, with a vision to 2045. |
|
Da Nang international airport logistics center |
Da Nang international airport |
A dedicated aviation logistics center with a planned scale of 4 hectares by 2030. Investors are proposed based on each development phase. |
2025 - 2030 |
Land has not yet been cleared |
|
|
Kim Lien freight station logistics center |
New Kim Lien railway station, near Hoa Khanh industrial park |
A railway logistics center with a planned scale of 5 hectares by 2030. Investors are proposed based on each development phase. |
2025 - 2030 |
Land has not yet been cleared |
|
|
Hoa Phuoc logistics center |
Hoa Phuoc commune, Hoa Vang district |
A logistics center, general warehouse, and transit hub for various types of goods, leveraging the advantages of seaports and its strategic location for North-South and East-West Corridor transportation. The planned area is approximately 20-25 ha. |
2025 - 2030 |
Agricultural land, rural residential land |
A new proposal in the field of commercial infrastructure, currently under consideration for integration into the city's master plan for the 2021-2030 period, with a vision to 2050. |
|
Wholesale industry supporting area - Hoa Phuoc, Đa Nang |
Hoa Phuoc commune, Hoa Vang district |
A supporting and transshipment area for agricultural, forestry, aquatic, and seafood products, as well as goods serving the wholesale industry and wholesale markets. It includes storage and preservation facilities for agricultural, forestry, and aquatic products, along with bonded warehouses for the wholesale market. Planned area: 50 - 55 ha. |
2026 - 2030 |
Agricultural land, rural residential land |
A new proposal in the field of commercial infrastructure, currently under consideration for integration into the city's master plan for the 2021-2030 period, with a vision to 2050. |