Dong Nai province is located in the Southern key economic region, with a natural area of 5,907.2 km². It serves as a gateway province to the Southeast economic region, which is the most developed and dynamic economic region in Vietnam. In particular, Dong Nai is one of the three corners of the development triangle formed by Ho Chi Minh City, Binh Duong, Dong Nai. The province hosts numerous traditional industrial clusters and over 32 industrial parks that have been approved by the Prime Minister and are operational, including Long Thanh, An Phuoc, Nhon Trach II, Bien Hoa II, Amata, ... In addition, Dong Nai Province boasts a rich and fertile land fund. Dong Nai's climate is characterized as a tropical monsoon climate, featuring two contrasting seasons: the dry season and the rainy season. Consequently, Dong Nai is one of the provinces attracting the highest levels of investment capital in the country.
No. |
PROJECT NAME |
LOCATION |
DIVERGENCE |
EXPECTED SCALE |
LAND STATUS |
---|---|---|---|---|---|
A. |
PUBLIC INFRASTRUCTURE FIELD |
||||
1. |
Trang Bom - Hoa Hung railway project |
The length is more than 39 km, stretching from Dong Nai through Binh Duong and Ho Chi Minh City |
2021 – 2030 |
Passing through 3 wards: An Hoa, Long Binh Tan, Phuoc Tan, requiring the recovery of land: 42 ha |
|
2. |
Bien Hoa - Vung Tau railway project |
The starting point is at Phuoc Tan ward (Bien Hoa city); The ending point is at Thi Vai port, Ba Ria - Vung Tau province. |
2021 – 2030 |
Passing through Phuoc Tan and Tam Phuoc wards, with the planned land area: nearly 28 ha |
|
3. |
Thu Thiem light rail project - Long Thanh airport |
The starting point is at Thu Thiem station, Thu Duc, Ho Chi Minh City; The ending point is at Long Thanh international airport. |
2021 – 2030 |
The proposed scale is a double track with 1,435 mm gauge, serving passengers only. The Thu Thiem - Long Thanh railway has a length of about 37 km. |
|
4. |
Dau Giay - Lien Khuong expressway construction project |
Passing through 2 provinces Dong Nai and Lam Dong |
9/2021 – 12/2043 |
The total length: 220 km. The Dau Giay - Lien Khuong section under study is about 201 km long, including segments: Dau Giay - Tan Phu (60 km) , Tan Phu - Bao Loc (67 km) and Bao Loc - Lien Khuong (74 km), designed for 4 lanes. |
|
5. |
Long Khanh city water supply and waste treatment system project |
Long Khanh city, Dong Nai province, includes: 6 central wards: Xuan Trung, Xuan Thanh, Xuan Hoa, Xuan An, Xuan Binh, Phu Binh and 3 communes Bau Sen, Suoi Tre, Bao Vinh |
2021 – 2040 |
Rainwater drainage system: |
|
6. |
Construction of a household waste treatment plant to generate electricity in Vinh Tan commune, Vinh Cuu district, Dong Nai province |
Vinh Tan commune, Vinh Cuu district, Dong Nai province |
2022 – 2025 |
The total project scale is 12 ha including the following main items: - Main factory cluster; - Sub-factories include: garbage receiving area; garbage bunker; drain and feed; leachate collection area; garbage incinerator - boiler room; steam turbine room; general control room; exhaust gas treatment area and chimney; ash storage area; compressed air chamber, repair room; - Office area and general area; - Auxiliary area includes: pumping station; cooling water tower; oil storage area; wastewater and leachate treatment station, slag and fly ash treatment area, weighing station, security room and parking areas; transformer station; - Internal roads, trees, water surfaces. |
|
B. |
MEDICAL - EDUCATION - SPORTS FIELD |
||||
1. |
Kindergarten in Tan Phu town |
Tan Phu town, Tan Phu district |
10 class groups |
Project land origin: land used by individual households |
|
2. |
Regional hospital |
Long Tan |
2022 – 2025 |
20 ha |
Project land origin: managed by the local community |
C. |
INFRASTRUCTURE INVESTMENT FIELD OF INDUSTRIAL PARKS AND INDUSTRIAL CLUSTER |
||||
1. |
Gia Kiem industrial park |
Gia Kiem commune, Thong Nhat district, Dong Nai province |
2021 - 2030 |
330 ha |
– Currently, the land has been leveled, fencesd and is constructing a drainage system – Non-agricultural land (skc) |
2. |
Industrial cluster (Long Giao industrial cluster ) |
Xuan Duong commune, Cam My district |
5.59 ha |
Public land: 3481/QD-UBND dated september 22, 2021 |
|
D. |
SERVICE TRADE FIELD |
||||
1. |
Central commercial area |
Hiep Hoa ward, Bien Hoa city |
2022 - 2025 |
11.6 ha |
|
2. |
Market at hamlet 10 Binh Son, code C195 |
Hamlet 10, Binh Son commune, Long Thanh district, Dong Nai province |
About 1.1 ha |
Public land is managed by the state |
|
3. |
Market of hamlet 6 Tan Hiep (now hamlet 2 Tan Hiep), code C181 |
Hamlet 6 (now hamlet 2 due to administrative boundary change), Tan Hiep commune, Long Thanh district, Dong Nai province |
About 1 ha |
Public land is managed by the state |
|
4. |
Commercial and service area (TTTM1) no. 47 according to Tan Phu town's QHC |
Tan Phu town, Tan Phu district |
2.49 ha |
|
|
5. |
Commercial and service area at the intersection of Phan Thiet - Dau Giay highway and national highway 1 |
Xuan Tam commune, Xuan Loc district |
29 ha |
The land areas are in accordance with construction planning and land use planning. |
|
6. |
Commercial and service area in area 3, Gia Ray town (bank of agriculture and rural development area) |
Gia Ray town, Xuan Loc district |
1.2 ha |
The land areas are in accordance with construction planning and land use planning. |
|
7. |
Commercial and service area in area 1, Gia Rai town (Hoang Hoa Tham street) |
Gia Ray town, Xuan Loc district |
48.5 ha |
The land areas are in accordance with construction planning and land use planning. |
|
E. |
INVESTMENT FIELD IN RESIDENTIAL AREA, URBAN AREA, SOCIAL HOUSING |
||||
1. |
Hiep Hoa urban area |
Hiep Hoa ward, Bien Hoa city |
2022 – 2024 |
About 293 ha |
B4 subdivision planning approved by the Provincial People's Committee |
2. |
Social housing apartment |
Tan Hoa ward, Bien Hoa city |
2022 – 2024 |
2.8 ha |
B4 subdivision planning approved by the Provincial People's Committee |
3. |
Social housing apartment |
Long Binh Tan ward, Bien Hoa city |
2022 – 2024 |
1.4 ha |
A1 subdivision planning and part of C2 approved by the Provincial People's Committee |
4. |
Land plots along Huong Lo 2 route |
An Hoa ward, Bien Hoa city |
2023 – 2030 |
44.18 ha |
C2 subdivision planning approved by the Provincial People's Committee |
5. |
Land plots along the Dong Nai riverside road |
Buu Long ward, Bien Hoa city |
2023 – 2030 |
34.03 ha |
Zoning planning scale 1/2000 for Buu Long ward |
6. |
Land plots along the Cai river |
Wards: Quyet Thang, Thong Nhat, Tan Mai, Tam Hiep, Binh Da |
2023 – 2030 |
49.95 ha |
Zoning planning scale 1/2000 for Quyet Thang, Thong Nhat, Tan Mai, Tam Hiep, Binh Da wards |
7. |
Social housing area |
- Long Tho commune, Phuoc An, Nhon Trach district - Phuoc Thien commune, Nhon Trach district |
2022 – 2025 |
4 ha 4.2 ha 5.61 ha 2.1 ha 1.6 ha |
|
F. |
TOURISM FIELD |
||||
1. |
Chua Chan mountain and Nui Le lake tourist area project |
Xuan Loc district, Dong Nai province |
2023 - 2030 |
The ecotourism and resort complex project in Chua Chan mountain and Nui Le lake area has a research scope of about 4,000 ha divided into 9 zones. The project is planned to implemented into 3 phases : - Phase 1 (2023-2025): implementation area of more than 390 ha; - Phase 2 (2025-2030): implementation area of more than 348 ha; - Phase 3 (after 2030): implementation area of more than 700 ha. |
After reviewing and comparing the project implementation boundaries from zone 1 to zone 8, it was found that over 1,000 ha do not conform to the land use planning and more than 1,200 ha do not conform to the general planning for construction of commune, town projects. |